Dernières nouvelles de l'entreprise sur The Headhaul Booking Window Opens Earlier Than Your Packing List Closes
2026-10-21 23:03:20

The Headhaul Booking Window Opens Earlier Than Your Packing List Closes

Sellers plan a replenishment around the day the goods leave the factory. The booking gets made around something else entirely: the day a carrier can accept a cargo that is described well enough to be put on a manifest. Those two dates are usually a week apart, and the week in between is where a headhaul is either assembled or lost.

What a booking actually needs from you

Box count, gross and volumetric weight per box, the dimensions those weights came from, a commodity description your broker will accept, and the destination facility. A carton-level list, not a shipment total. The reason is physical: a consolidated container is assembled from many sellers' cartons, and a booking that only describes the aggregate cannot be placed against space that is sold by the cubic metre. Our FBA first-leg page spells out the paperwork chain, and the booking-window article covers the seasonal calendar.

Three clocks, one of which you control

The prep clock is how long a shipment of cartons takes to arrive, get counted, get labeled and be stacked as a bookable cargo. The carrier clock is a cut-off for cargo description and a second one for physical receipt. The port clock is gate availability and vessel space, which nobody outside the line can promise. Sellers lose the window on the first clock more often than the second, because goods-in is treated as a formality when it is actually the operation. Anything that still has to be relabeled on arrival is not a shipment, it is a project.

Where origin prep buys you days

A shipment that arrives at a container freight station has to be counted, stored and re-presented on someone else's schedule. A shipment that arrives at a China to Germany lane feeding warehouse where we already hold your stock, already know your carton specs and already have your labels printed goes straight onto a booking. That is the practical value of prep at origin rather than at the destination: fewer handovers, less dwell, and a booking date you can repeat. It does not make a sailing faster, and we do not claim it does.

What to do when the window is already gone

Split the shipment. A portion moves on the next available booking, a portion moves on a faster, dearer mode, and the split is decided by which SKUs are actually at risk of running out rather than by the shipping term you like. Air and sea rarely mix well inside one plan because their economics behave differently on the same invoice, and how a heavy or long load gets booked is a separate question again once a carton stops fitting a standard box. If you are deciding between modes for the first time, price them as separate shipments and resist the temptation to average them into one number.

Write the timeline backwards from the cut-off

Start with the day a carrier must physically receive the cargo and step back: one working day for the manifest and document check, two to three days for crating or re-packing if the load is awkward, three days for carton-level counting and labels at the receiving warehouse, and whatever your factory needs to deliver into us. Sellers who build the plan forward from a factory completion date keep arriving at the cut-off with paperwork still open; sellers who build it backward arrive with a spare day. A calendar that only contains the delivery date is not a plan, it is a wish, and the freight layer has no way to help a wish.

The honest limits

We can hold cargo, prep it, describe it correctly and place it with a carrier the moment space exists. We cannot sell a sailing that has no space, and we will not pretend a booking date is fixed before the cargo is physically inside. Two figures are worth building your plan around: goods accepted before the 16:00 cut-off move that evening on the lanes that support it, and an air DDP door-to-door run is quoted as 5-9 working days, which is a range rather than a promise and should be treated as one by anyone putting a launch date behind it.