Project Cargo as a Document Chain: Lift Plans and Permits

Brief Review
Heavy-lift contracts run on BIMCO HEAVYCON and HEAVYLIFTVOY; movements run on a six-stage milestone chain that is practice rather than standard. What the 2026 SOLAS rules add, and six questions to ask.
Service Attributes
Service Description

A Project Is a Chain of Signatures

Ordinary freight is a booking. Project cargo is a sequence of documents in which somebody takes responsibility for a physical act, and the next document assumes that act was done properly. When a project fails, it almost never fails at sea; it fails in a gap between two papers, where each party reasonably believed the other had covered it.

That reframing is useful because it converts an intimidating category into something a buyer can test. You do not need to evaluate whether a partner “can handle project cargo”. You need to ask who signed each of six documents, in what order, and what happens if one of them is late.

Two Contract Shapes, and Why the Difference Costs Money

BIMCO publishes the standard forms the heavy-lift market actually contracts on. Two matter to a shipper.

  • HEAVYCON, in its 2007 edition, is a multimodal transport contract for heavy goods: one document covering haulage from door to door with several legs and, typically, several modes inside it. Where a single item has to be moved, lifted and landed under one responsibility, this is the shape the conversation defaults to.
  • HEAVYLIFTVOY is the heavy-lift voyage charter form — the vessel is engaged for a lift or a movement, and the questions of stowage, gear and supervision get answered in a charter party rather than a through-transport contract.

Neither form is obligatory, and a party is free to propose its own terms. The point is diagnostic: ask which structure the quote is written on. A project priced as a set of individual legs, each with its own contract, has no single owner for the transfers — and transfers are where projects lose days.

The Milestone Chain Is Convention, Not Standard

Say plainly what follows, because vendors sometimes imply the opposite: the sequence below is how experienced operators run projects. It is not a published rule, and no regulation will enforce it for you.

  1. Feasibility — can this move at all, on this equipment, through this route, in this window.
  2. Route survey — bridges, turns, clearances, cable heights, bearing pressure on the actual roads rather than the mapped ones.
  3. Lift plan — rigging arrangement, sling loads, gear capacity, and who calculated it.
  4. Method statement — the written order of operations, with hold points.
  5. Permits — abnormal-load authorisation at every jurisdiction the wheels touch.
  6. HSE briefing and sign-on — the crew that executes it hearing the same version you approved.

Each stage has a natural owner and a natural document, and every dispute in this category is a disagreement about which. A route survey delivered as a map screenshot is not a survey. A lift plan signed by a sales office is not a calculation. The chain’s value is that lateness becomes visible early: a permit problem found at stage five can be solved; found on the loading dock, it is a rolled booking.

Two disciplines make the chain work in practice rather than on a slide. The first is a hold point — a stage that cannot be passed until a named person signs, typically the lift plan before gear is ordered and the survey before a permit is filed. The second is one schedule owner reconciling vessel availability, permit turnaround and site access into a single dated plan. Three competent parties each holding their own spreadsheet is how a project arrives complete and gets refused at the gate over a paper that existed six weeks earlier.

What Arrived on 1 January 2026

Two amendments in the package that took effect at the start of this year touch project movements directly.

The first concerns lifting appliances. SOLAS regulation II-1/3-13 brings ships’ lifting equipment, including deck cranes and heavy-lift gear used on board, under a defined regime covering design, testing, examination, maintenance and thorough documentation. For a shipper the practical effect is a paperwork question rather than an engineering one: whose gear is doing the lift, and does its survey record exist and sit inside its period. Ask for it before the crane arrives, not when the hook is loaded.

The second concerns containers lost at sea. New requirements under SOLAS chapter V, regulations 31 and 32, together with MEPC.384(81), make the reporting of container losses a defined obligation, with the notification routed to the coastal and flag states concerned. Why a project shipper cares: the reason the rule exists is that loss events are consequential enough to be legislated, and heavy unit loads in particular are the cases where a securing failure has real consequences. Which manual governs the securing on your assigned vessel, and who wrote the calculation?

What a Project Quote Should Break Out

A lump sum for a project hides the sequence. A quote that supports the document chain itemises the same six things the chain produces: survey, lifting gear and its certification, the permit set with the jurisdictions named, escort or pilot requirements, standby days if a lift window moves, and the securing arrangement with whoever calculated it. You are not buying those line items separately; you are buying the right to see which of them somebody else assumed you had covered.

Two of them behave like clock risk rather than cost. Permit turnaround depends on authorities you do not instruct, and a tidal or crane window at the destination site belongs to your contractor. A quote that lists both as assumptions, with the date each was last confirmed, tells you the person writing it has run a movement before.

Six Questions That Separate Experience From Confidence

  1. Which contract form is this quote written on, and who owns the transfers between legs?
  2. Who performed the route survey, and what did they physically attend?
  3. Who signs the lift plan, and against which gear certificate is the capacity checked?
  4. Which cargo securing manual does the assigned vessel use, and is your lashing arrangement calculated against it?
  5. Permits: which jurisdictions, applied for by whom, and what is the fallback routing if one is refused?
  6. If the lift slips a day, what happens to the vessel window, the tidal slot, or the site crane availability behind it?

These are not rhetorical. A partner who has run projects answers them with names, dates and attachments. A partner who has read about projects answers with reassurance.

Where Our Name Goes on the Documents

The split we work to is the one the category is built around: urgency and mass get separated instead of averaged. Time-critical electronics go by air with the delivery terms settled; heavy structures, fit-out material and machinery go by sea on planned equipment; several suppliers’ consignments get consolidated into one arrival schedule so a site receives a programme rather than a trickle. A hospitality fit-out into Germany we ran on that principle moved a volume in the high hundreds of cubic metres, with the electronics arriving inside a week and the furniture and building material roughly four weeks later, on one plan.

What that description does not claim is the part a buyer should verify independently: the gear certificates, the permit applications, the lashing calculations and the site lift. Those are named in the quote by whoever performs them, and where an item belongs to your contractor rather than to us, we say so before booking instead of discovering it on the quay.

Project cargo is not sold by capability statements. It is sold by a document chain with owners. Send the item’s mass and dimensions, the two road legs, the delivery window and the site’s lifting arrangement, and the six questions above get answered in writing — with the transit figures marked as estimates, because vessel rotation, permit turnaround and port conditions move them.